PlotSet LogoPlotSet

How to Create a Treemap

A step by step walkthrough for turning a spreadsheet into a published treemap in PlotSet, from shaping the category and parent columns to exporting or embedding the finished tiles.

Etwa 8 Minuten

This is how to create a treemap in PlotSet from your own spreadsheet: tiles sized by value, grouped by hierarchy, coloured on purpose, then published as a live embed or exported as an image. Your own rows go through the same upload-to-publish path a real PlotSet treemap takes, including the one column that trips people up: the parent.

If your spreadsheet already has a category, a parent and a value in three columns, eight minutes gets the whole thing done. Pulling the data out of a pivot table first adds another five, since pivot exports usually carry subtotal rows that need to come out before the tiles will size correctly.

Die Daten, die Sie brauchen

Three columns, one row per tile: the category name, its parent group (blank for a top-level tile), and a positive number. One header row, no subtotal rows.

Beispiel-CSV
CategoryParentRevenue
North America4200000
Europe3100000
Asia Pacific1800000
United StatesNorth America3300000
CanadaNorth America900000
GermanyEurope1400000
FranceEurope900000
United KingdomEurope800000
JapanAsia Pacific1100000
AustraliaAsia Pacific700000
Hinweise

Leave the parent column blank for a top-level row, not filled with a placeholder like "None" or "Top". A blank cell is how PlotSet knows a tile has no ancestor; a text placeholder gets read as an actual parent name and adds a stray tile.

Every value must be zero or greater. A negative revenue or a loss row will not render as a tile, since a rectangle cannot have negative area, so pull those rows into a separate table before you upload.

If you are working from a pivot table, delete the grand total and subtotal rows first. A "Total" row uploaded alongside real categories becomes a tile of its own, usually the largest one on the page.

A flat treemap with no hierarchy works too: just leave the Parent column out entirely, or leave every cell in it blank, and every row becomes a top-level tile.

Parent names have to match a Category value exactly, including case and spacing. "north america" in the Parent column will not find "North America" in Category, and that child tile gets dropped.

Die Schritte

Der genaue Klickpfad in PlotSet, von einer leeren Vorlage bis zum fertigen Diagramm.

  1. 01

    Open the treemap template

    From the PlotSet dashboard, start a new project and choose the Treemap template. It loads with sample data already bound, tiled by category, parent and value, so you can see the exact three-column shape before you swap in your own file.

    Die Vorlagenauswahl von PlotSet: links die Liste der Diagrammkategorien, daneben das geöffnete Raster "Bar Charts" und die Vorlagenkarte "Bar Chart" mit ihrer Schaltfläche "Select".
    Jede Anleitung beginnt hier. Wählen Sie erst die Kategorie, dann die Vorlage. Das Raster ist für jeden Diagrammtyp dasselbe.
  2. 02

    Shape your sheet into category, parent and value

    One row per tile: its name, the group it sits inside, and its size. If your source is a pivot table or a finance report, pull those three fields out into a plain flat sheet first. No merged cells, no subtotal rows.

  3. 03

    Upload the sheet or connect a live one

    Use the data panel to import a CSV or .xlsx file, paste rows straight from a spreadsheet, or connect a Google Sheet so the treemap can be refreshed later without a re-upload. PlotSet reads the first row as headers.

    Die Datenansicht im PlotSet-Editor: ein Tabellenraster mit den Spalten "Name", "Value" und "Region", gefüllt mit Zahlen zu kanadischen Provinzen, daneben der Bereich "Data" mit "Upload CSV File", "Magic Import" und der Synchronisierung über "Google Sheet".
    Die Datenansicht, hier in einem Balkendiagramm-Projekt. Laden Sie über "Upload CSV File" eine CSV-Datei hoch, holen Sie die Zahlen mit "Magic Import" aus einem Bild oder verbinden Sie ein Google Sheet. Der Bereich sieht bei jedem Diagrammtyp gleich aus.
  4. 04

    Map the category, parent and value columns

    Confirm which column feeds the tile name, which one feeds the parent group, and which one sizes the tile. PlotSet usually guesses right when your headers are clear, but check it manually if your sheet has extra columns sitting between them.

    Der Datenbereich von PlotSet mit hervorgehobenen Spaltenzuordnungen: "Label/time" auf Spalte A, "Values" auf Spalte B und "Filter/color" auf Spalte C, darunter die Schaltfläche "Auto Binding".
    Die Zuordnungen legen fest, welche Spalte zur Beschriftung wird, welche die Werte liefert und welche die Farbe steuert. "Auto Binding" errät sie anhand Ihrer Spaltenüberschriften. Prüfen Sie das Ergebnis, statt sich darauf zu verlassen.
  5. 05

    Check the hierarchy renders the way you expect

    Look for a top-level tile that is really a stray parent name, or a child tile that vanished because its parent value did not match exactly. Fix mismatches in the source sheet and re-upload rather than patching the chart by hand.

  6. 06

    Colour by group, not by size

    Size is already spoken for by the tile's area. Set the colour scale to the parent group so the hierarchy reads at a glance, or switch it to a second numeric column, growth rate or margin, if you want colour to carry a different story than area does.

    Der PlotSet-Editor im Tab "Preview": ein fertiges Diagramm vom Typ "Treemap" auf der Arbeitsfläche und der rot umrandete Einstellungsbereich am rechten Rand.
    Der Tab "Preview" für ein Diagramm vom Typ "Treemap". Alle Gestaltungsoptionen stecken im umrandeten Bereich: Aussehen, Kopfzeile, Fußzeile und die Optionen, die es speziell für diesen Diagrammtyp gibt, jeweils in einem eigenen Tab.
  7. 07

    Turn on labels for the tiles big enough to hold them

    PlotSet hides labels automatically once a tile gets too small to fit text without overlapping its neighbours. Leave that behaviour on rather than forcing every tile to label, and rely on the hover tooltip to surface the exact value for the small ones.

  8. 08

    Publish, embed or export the tiles

    Publish for a live interactive treemap with hover tooltips and a shareable link, grab the embed code to drop it into a page, or export a PNG, SVG or PDF if you need a static image for a deck or a report.

Starten Sie mit der Treemap-Vorlage samt bereits geladenen Beispieldaten und ersetzen Sie diese durch Ihre eigenen.

Vorlage öffnen

Veröffentlichen, einbetten oder exportieren

Der letzte Abschnitt ist bei jedem Diagrammtyp gleich: "Share" macht aus dem Diagramm einen öffentlichen Live-Link und einen Einbettungscode, "Export" schreibt es als statische Datei heraus.

"Share": öffentlicher Link und Einbettungscode

Aktivieren Sie den Einbettungscode und den öffentlichen Link, um das Diagramm zu veröffentlichen. Den Link können Sie bedenkenlos an alle weitergeben, und der Einbettungscode fügt sich als iframe in jede Seite ein. Die Tooltips beim Überfahren mit der Maus und die volle Interaktivität bleiben erhalten. Wenn Sie das Diagramm später bearbeiten, überträgt "Recreate" die Änderungen auf Link und Einbettung.

Die Werkzeugleiste des PlotSet-Editors mit der hervorgehobenen Schaltfläche "Share" direkt neben der Schaltfläche "Export".
Über "Share" werden aus dem fertigen Diagramm ein öffentlicher Link und ein Einbettungscode.
Der Dialog "Share" von PlotSet: der Schalter, der den Einbettungscode und den öffentlichen Link aktiviert, die Schaltflächen "Link", "Embed", "Facebook", "Reddit", "Twitter", "LinkedIn" und "Email" sowie der öffentliche Diagrammlink mit der Schaltfläche "Copy".
Aktivieren Sie den Einbettungscode und den öffentlichen Link, kopieren Sie dann den Link oder den iframe-Code. Mit "Recreate" erreichen spätere Änderungen alle, die den Link bereits haben.

"Export": SVG, PNG oder JPG

"Export" schreibt eine statische Kopie in der Größe heraus, die Sie brauchen. SVG bleibt in jeder Skalierung scharf und lässt sich weiterhin in einem Design-Tool bearbeiten; PNG und JPG sind die sichere Wahl für Folien und Dokumente. Der Skalierungsfaktor sorgt dafür, dass das Bild auf einem Retina-Display gestochen scharf wirkt.

Die Werkzeugleiste des PlotSet-Editors mit der hervorgehobenen Schaltfläche "Export".
Über "Export" bekommen Sie eine statische Datei für eine Folie oder einen Bericht.
Der Dialog "Export chart" von PlotSet: die Skalierungsauswahl auf 2x, die Felder für Breite und Höhe mit 1000 mal 600 und das geöffnete Formatmenü mit "SVG", "PNG" und "JPG".
SVG bleibt in jeder Größe scharf und im Design-Tool bearbeitbar; PNG und JPG sind die sichere Wahl für eine Präsentation. Stellen Sie die Skalierung vor dem Export ein, damit das Bild auf einem Retina-Display gestochen scharf ist.

Styling-Tipps für Treemap

Group the long tail into one tile

If your data has three big categories and forty tiny ones, the tiny ones will shrink into unreadable slivers regardless of how you colour them. Sum the small rows into a single "Other" row before upload, and mention in a caption what it covers.

Use colour for the second variable you actually care about

A treemap gives you two channels to work with: area for value, colour for anything else. Wasting colour on the same value the area already shows (a common default) throws away half the chart's power. Try colouring by year-over-year change instead.

Keep the hierarchy to two levels

PlotSet will nest a third level, but by the time tiles are three groups deep, individual rectangles are too small to compare or even see. If your data goes deeper, pick the two levels that matter most to the reader and flatten the rest.

Name the "Other" bucket specifically

"Other" on its own reads as a shrug. "Other: 14 regions under $50k" tells the reader exactly what got folded in and why it is not broken out, without them needing to ask.

Häufige Fehler bei Treemap

A tile is missing even though the row is in the sheet

The parent name in that row almost certainly does not match a category value exactly, often a trailing space or a different capitalisation. Compare the two columns directly in the spreadsheet, fix the mismatch, and re-upload rather than editing inside PlotSet.

One enormous tile dominates the whole treemap

This is usually a subtotal or grand total row from a pivot export that got uploaded as if it were a real category. Scroll to the bottom of the source sheet, delete the totals row, and re-upload.

Half the tiles are unlabelled and it looks broken

It is not broken: PlotSet is hiding labels that would overlap or overflow a small tile. Check the hover tooltip to confirm the value is still there, and if you need more tiles labelled, group the smallest ones into an "Other" tile so the remaining ones have more room.

Mehr über Treemap erfahren

Nicht sicher, ob Treemap die richtige Wahl ist? Erfahren Sie, was es ist, wann Sie es verwenden sollten und wann nicht.

Über Treemap

Treemap: häufige Fragen

Three columns: category, parent, and value, with one row per tile. Leave the parent blank for top-level tiles, or drop the column entirely for a flat treemap with no hierarchy. CSV and .xlsx both work.

Jetzt Treemap erstellen

Kostenlos starten mit über 300 Vorlagen. Keine Kreditkarte erforderlich.