Gas leads the growth in US data center electricity to 2035
Electricity from gas used by US data centers is set to climb from 46.8 TWh in 2020 to 346 TWh in 2035, according to the International Energy Agency's current policies scenario.
L'histoire
Between 2025 and 2035 gas adds 248 TWh, from 98 TWh to 346 TWh. A jump of 30 TWh in 2026 starts the climb, and the yearly gain peaks at 35 TWh in 2027 and 2028 before slowing to 11 TWh in 2035.
Gas was already the largest source in 2020, ahead of coal's 23.8 TWh. By 2035 it sits 237 TWh above nuclear, 346 TWh against 109 TWh.
Nuclear rises from 22.9 TWh in 2020 to 109 TWh in 2035, the biggest gain after gas. Solar PV climbs from 3.2 TWh to 59.1 TWh, and wind from 9.5 TWh to 50.9 TWh.
Coal peaks at 45.4 TWh in 2032 and eases to 43.9 TWh by 2035, still well above its 23.8 TWh in 2020. The smallest category, Other, moves from 1.5 TWh in 2020 to 2.0 TWh in 2035.